Overland Trail Middle School
Overland Trail Middle School
Alan Ford Architects teamed with Studiotrope Design Collective to develop master planning for Overland Trail Middle School in Brighton, CO. Overland Trail Middle School was a bond funded renovation and addition project. A design advisory group was utilized in the design process and a through analysis of the existing building and program was performed. The design for the Middle School increases the capacity for a growing local population and integrates the facility with I.B. and 21st century learning principles.
Client: School District 27J
Location: Brighton, CO
Completed Date: December 2018
Area: 85,223SF
Cost: $6.5M