Overland Trail Middle School Addition/Renovation

  • School District 27J

  • Brighton, Colorado

  • 85,223 sq ft

Increased capacity for a growing population

Overland Trail Middle School was a bond funded renovation and addition project. A design advisory group was utilized in the design process and a through analysis of the existing building and program was performed. The design for the Middle School increases the capacity for a growing local population and integrates the facility with I.B. and 21st century learning principles.

Previous
Previous

Habitat for Humanity

Next
Next

Montbello High School Renovation